Category A (Cat A)
The landlord's base fit-out that makes a floor lettable: suspended ceilings, raised floors, lighting, heating and cooling, and finished walls, with no tenant rooms.
Category A plus (Cat A+)
A Cat A floor let with some Category B elements already in place, such as a kitchen, a few meeting rooms and furniture, so a tenant can move in quickly.
Category B (Cat B)
The tenant's fit-out built into a Cat A shell: rooms, kitchens, finishes, furniture and branding.
Shell and core
A building delivered with only its structure, envelope, lifts, stairs and main services; floors have no ceilings, raised floors or finishes.
Licence for alterations
The landlord's written consent, required by most leases, before a tenant alters the premises.
Schedule of dilapidations
A list, prepared by the landlord's surveyor, of repairs and reinstatement the tenant must carry out or pay for at lease end.
Schedule of condition
A record, usually with photographs, of the state of premises at the start of a lease, used to limit future dilapidations claims.
Reinstatement
Returning premises to their original condition by removing tenant alterations, as a lease requires.
Net internal area (NIA)
The usable floor area inside a building measured to the internal face of perimeter walls, excluding cores, stairs and plant areas.
Test fit
A draft layout showing how desks, rooms and storage fit a floor, used to check a building suits a business before committing.
Space planning
Arranging people, rooms, storage and circulation on a floor so it works for how a team operates.
Raised access floor
Removable floor panels on adjustable pedestals, creating a void for power and data cabling.
Suspended ceiling
A secondary ceiling hung on a metal grid below the structural slab, hiding services and carrying lights and detectors.
MF ceiling
A metal-furring plasterboard ceiling giving a smooth, seamless finish.
Demountable partition
An internal wall system, often glazed, that can be taken down and reinstalled elsewhere.
dB Rw
A laboratory rating of how much sound a wall or partition blocks; a higher number means better sound insulation.
Manifestation
Visible markings or film on glazed partitions and doors so people do not walk into the glass.
Floor box
A power and data outlet set into a raised access floor beneath desks.
Small power
General-purpose socket outlets and desk power, as distinct from lighting and plant circuits.
Structured cabling
The standardised data cabling system, such as Cat6 or Cat6A, that connects desks and devices to the comms room.
M&E
Mechanical and electrical services: heating, cooling, ventilation, plumbing, power, lighting and data.
Preliminaries
Project costs not tied to a single trade, such as site management, welfare, protection, waste removal and access equipment.
Snagging
Identifying and fixing minor defects before and just after handover.
Defects period
A period after completion, commonly 12 months, during which the contractor returns to fix defects that appear.
Decant
Temporarily moving staff to another area or building while their space is worked on.
Out-of-hours working
Carrying out noisy or disruptive works in evenings, nights or weekends to keep an office usable during the day.